Monthly Archives: March 2021

b97_photo-002

THULE AIR BASE – Dormitory Building 97

Complete renovation of building 97. Building 97 was originally completed in 1959 as a 3 story Dormitory Building of approximately 3.000 m2.
The project included demolition of existing conditions except load bearing steel structure and steel- and concrete decks. An addition in 3-story’s was added to the existing building – adding approximately 200 m2 for future common areas.
After completing foundation and steel works for mentioned addition, the building envelope was closed with high-insulating foam panels and low-energy windows (3 layer glass) on all building surfaces.

Internally the building was designed and completed with 42 independent apartment units, each with kitchen/living room, rest- and bathroom and bedroom. In addition to this, various mechanical rooms for heating system, water, ventilation and sprinkler. The project included complete replacement and addition of new installations, such as; HVAC, sprinkler, electrical, plumbing and fire alarm systems.
The building envelope was complete in a 2 month period during summer time. Working this far north involves brief summers and very harsh weather conditions, which requires extreme detail and attention to planning and coordination, as the summer period for external work is so short.

The work was initiated with demolition in 2017. Due to 2 project suspension due to outside factors and finally COVID19, the project was completed in February 2021. Originally the project had a time frame of a bit more than 1 year from start demolition.

Facts:
General Contractor: Adserballe & Knudsen Greenland A/S
Client: US Air Force
Contact: Niels Laursen, CEO, AK Greenland A/S
Project value: 20.4 million US Dollars 127 million Danish Crones
Work period: 2017 – 2020

byg-211

THULE AIR BASE – Exchange and APO, Building 211

Complete renovation of a 1950′s building at Thule Air Base, which during the last 70 years have had several purposes; once a Diner for the base personnel.

The project included demolition of everything inside the building except load bearing wooden frame. Existing facades and roof was kept, but clad in new surfaces.

Inside the building was divided into 3 separate functions; Base Exchange, APO and TELE.
All new installations was made for HVAC, sprinkler, electrical, plumbing, fire alarm etc., and new walk-in cooler and freezer facilities was built in.

In addition to this new insulated walls, ceilings and floors and all surface materials.

The project was carried out from April 2013 to November 2013.

Facts:
General Contractor: Adserballe & Knudsen Greenland A/S
Client: US Air Force
Contact: Niels Laursen, CEO, AK Greenland A/S
Project value: 4.8 million US Dollars 30 million Danish Crones
Work period: April 2013 – November 2013